Hoard a Cord (pt.2)

Development has continued on the firewood holder, weather permitting. And of course, my own physical health permitting. So it’s been slow, but still progressing.

Adding a roof was critical to the project. Keeping the wood off the ground and neatly stacked was the main goal, but keeping it dry and free of falling debris would negate the panicked run to restock the patio supply prior to a rain prediction. Plus, it’d look nicer. So, here I would learn how to build trusses.

I attached some 2x4s at a 10 degree angle – which seemed like a happy medium. It’s apparently the minimum grade for shingled roofs, and while I plan to attach leftover metal paneling from the house roof, it give me a little extra buffer.

Next, I added some decking planks as rafters to support the roof. Fairly straightforward:

Finally, some externally-rated OSB:

Unfortunately, the weather turned sour and halted work. I had hoped to get to the metal portion sooner rather than later, as the moisture is starting to warp the OSB. If that poses a problem, I might swap it out in favor of more deck boards. But that’s TBD.

In the meantime, it does conceptually work as intended. The wood, for the most part, is shielded from precipitation. Once I have a dry day I’ll get the metal on and finally be done with this.

–Simon

Leave a Reply

Your email address will not be published. Required fields are marked *